Beautiful residential complex in a new project in Mersin, Mezitli

€ 104,000 – € 129,000
ID 65546
Location
City:
Mersin
District:
Мезитли
To beach:
900 m
About object
Bedrooms:
2
Living rooms:
1
Area:
67 — 70 m²
Description

Already in the summer of 2023, the construction of an excellent project in Mersin, Mezitli is being completed. Geographically, the complex will be located in the Soli microdistrict, open for obtaining a residence permit. The area is dominated by new development combined with luxury hotels. The sandy beach of Salt has a gentle entrance to the sea, there are paid sun loungers and umbrellas. Visiting the ruins of the ancient city of Soli-Pompeiopolis, you can get acquainted with the rich historical past of the region. Everything you need for everyday life is within walking distance: pharmacies, a clinic, chain stores, a shopping center, a farmers' market, a promenade for walking, parks, children's and sports grounds.


Two residential blocks and additional infrastructure of the project will occupy a plot of 4365 m2. It is also important that the houses will be gasified, which means that in winter the apartments will be warm and comfortable. For the comfort of residents, an outdoor swimming pool will operate, children will be able to frolic in the fresh air, playing with their peers on safe children's and basketball courts. And the whole family can have a good time in the recreation area with gazebos and barbecue. Parking is provided for personal vehicles. Distance to the sea - 900 meters.


Available for sale are 2 + 1 apartments with an area of ​​67 - 70 m2 and 2 + 1 apartments with a terrace. All of them will be handed over with a fine finish, suspended ceilings, a kitchen set, wardrobes in the hallway and bathroom, and wiring for heating and air conditioning. The bathroom will be equipped with first class sanitary ware and a shower cabin.


For the convenience of buyers, the developer provides installments until the end of construction with a down payment of 50%.


Construction start date: April 2022.
Completion date: August 2023.

Infrastructure
Swimming pool
Basketball playground
Playground
Gazebo
BBQ area
Parking
Generator
Protected territory
Concierge
Elevator
Contact Agent