Excellent project in Gazipasa at the initial stage of construction

€ 150,000 – € 190,000
ID 65557
Location
City:
Gazipasa
To beach:
1500 m
About object
Bedrooms:
1, 2
Living rooms:
1
Area:
60 — 90 m²
Description

Hurry up to book an apartment in a new residential complex in Gazipasa at the best price at the initial stage of construction. The city of Gazipasa is included in the registration of a residence permit, so foreigners (both owners and tenants) can register in apartments. For a comfortable life, there is everything you need here: schools, kindergartens, a university, a hospital, a clinic, dentistry, pharmacies, banks, playgrounds and landscaped parks. Shopping can be done at chain stores, the mall, and the farmer's market. Gazipasa has beautiful beaches. Long sandy beaches with a gentle entrance to the sea are suitable for families with children, while adults can visit romantic secluded bays with picturesque landscapes. Distance to the sea - 1500 meters, to the international airport - 3.5 km.


The new project will be located on a plot of 5300 m2 in the form of a 10-storey residential block with a large landscaped adjacent territory. You can have a good time in the summer pool or in the bar next to it. Children will be happy to frolic on the water slides or on the safe playground. In winter, you can swim in the heated indoor pool. There are open and covered parking for personal vehicles. The caretaker of the complex will always help you in solving everyday issues.


Apartments with good footage are available for purchase: 1 + 1 with an area of 60-70 m2 and 2 + 1 with an area of 90 m2. All apartments are rented with a high-quality fine finish, a kitchen set and bathrooms equipped with sanitary ware and a shower cabin.


For your convenience, the developer provides an interest-free installment plan until May 2024 with an initial payment of 40%. It should be noted that a gradual increase in prices is planned as the complex is being built, which means that the cost of the apartment will increase significantly upon completion of construction.


Project start: 02/01/2023
Completion of the project: 30.08.2024

Infrastructure
Swimming pool
Indoor pool
Playground
Parking
Underground parking
Generator
Protected territory
Concierge
Bar
Contact Agent